RapidSiteplan

Site plans for Moreton Bay, Queensland: drawn in minutes

Need a site plan for a shed, patio, carport, deck, pool or granny flat in Moreton Bay? Site plans and assessments in minutes, drawn over the real lot.

Towns and suburbs in Moreton Bay include Caboolture, Redcliffe, Strathpine, North Lakes and Bribie Island.

Building in Moreton Bay

Moreton Bay lets a carport sit a little closer to the street than other structures, with low maximum and mean heights when it is in front of the house. Every other domestic outbuilding has its own height limits and sits behind the main building line, clear of frontage and waterway setbacks, and the combined roofed area of all outbuildings is capped in steps by lot size.

Secondary dwellings are tightly set: the floor area cap rises slightly on larger lots, the lot needs a minimum size and frontage, varying by precinct, and a granny flat shares one water, power and sewer connection, one street number, letterbox and driveway with the house. In some areas a larger one may sit further from the house.

Unitywater decides sewer build-over. The City of Moreton Bay maps bushfire, flood, heritage and landslide, relevant in Caboolture, Redcliffe, Strathpine and North Lakes, and runs a DA Tracker.

What we hold for Moreton Bay

For Moreton Bay we hold the council’s own rules for:

  • sheds, garden sheds, garages and carports
  • patios, pergolas, louvred roofs, decks and shade sails
  • pools, fences and retaining walls
  • granny flats
  • driveways, water tanks and shipping containers

We also hold its current fee schedule.

Build-over of sewer and water assets is decided by Unitywater.

At each lot we check the council’s own mapping for flood, bushfire, landslide and heritage, and the state’s mapping for flood, bushfire, landslide, heritage and native vegetation. We also read the council’s application register for past applications on the lot.

Last checked

How approval works in Queensland

In Queensland a building certifier, usually a private one, gives the building approval for work on a house lot, and the council comes in for the parts it controls. The smallest structures are accepted development and need no building approval when they meet the state's standards. Anything larger needs building approval, and a structure that sits closer to a boundary or the street than the siting rules allow also needs the council's agreement to a siting variation; an overlay or the zone in the council's planning scheme can add a planning approval on top. The certifier and the council read the site plan for where the structure sits against each boundary, the house and any easement. Its size, its height and its distance to each boundary decide which way it goes, as per the Queensland Housing Code and the Building Regulation 2021.

Drawing the plan

Type the property address, the lot’s real boundaries load from official land records in Queensland, and you place the structure over the aerial view. The plan prints to scale with boundary lengths, setback distances, a north arrow, a legend, a site coverage table and a title block, as the site plan for a building approval or a DA.

What a certifier in Moreton Bay will ask you

How big can a granny flat be, and how far from the house?

The council caps a granny flat’s floor area, and some councils also limit how far from the house it may stand. The sheet prints the floor area and dimensions the distance to the house.

How deep is the pool?

The depth decides whether the water needs a barrier, and the barrier has to be in place before the pool is filled. The barrier is what gets inspected, so the sheet shows where it runs and every gate with its swing.

Is the lot in an overlay, and what is the zoning?

A flood, bushfire, heritage or character overlay can bring a planning approval on top of the building approval, and the zone decides which of the council’s rules apply. The mapped overlays are read at the lot as the structure goes on the plan.

Are there easements, sewer mains or other services?

Work near a sewer or water main goes to the asset owner before the certifier can sign it off, on a timeline of its own. Mapped easements and mains show on the lot as it loads.

The figures for your own lot are read in a minute, from its address.

Every question a certifier asks is on the Queensland page.

Approval for the job in Moreton Bay

Changes on the way

Rule changes announced for Moreton Bay, for Queensland and for the whole country, the state and national lines in full on the Queensland page, each with the page that says so and the day we read it.

In the next 90 days

Nothing due in the next 90 days that we know of.

Later

  1. CommencesQueensland

    National Construction Code 2025

    Source qbcc.qld.gov.au, read

  2. CommencesAustralia-wide

    ABCB Housing Provisions 2025 (with NCC 2025)

    Source abcb.gov.au, read

  3. CommencesAustralia-wide

    AS 1926.1:2024 Swimming pool safety barriers

    Source ncc.abcb.gov.au, read

  4. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 10.8

    Source ncc.abcb.gov.au, read

  5. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 9.2

    Source ncc.abcb.gov.au, read

  6. CommencesAustralia-wide

    NCC 2025 Volume Two Part H6, Specification 42 and Housing Provisions Section 13

    Source ncc.abcb.gov.au, read

  7. CommencesAustralia-wide

    NCC 2025 Volume Two Part H8

    Source ncc.abcb.gov.au, read

  8. ExhibitedQueensland

    State Planning Policy (draft)

    Source statements.qld.gov.au, read

  9. AdoptedAustralia-wide

    National Construction Code, residential pause

    Source treasury.gov.au, read

  10. CommencesQueensland

    Queensland Housing Code

    Source business.qld.gov.au, read

  11. AnnouncedAustralia-wide

    National Construction Code, next edition

    Source abcb.gov.au, read

  12. No date yet

    ExhibitedMoreton Bay

    MBRC Planning Scheme 2016, Major Amendment No. 4

    In the mapped bushfire areas of the general residential, township, centre and industry zones, houses and class 10a buildings lose their exemption, so AS 3959 applies

    Source moretonbay.qld.gov.au, read

  13. No date yet

    AdoptedQueensland

    State-wide Bushfire Hazard Area (Bushfire Prone Area) mapping, published 2026

    Source tiles.arcgis.com, read

  14. No date yet

    AnnouncedAustralia-wide

    AS 3959:2018 Construction of buildings in bushfire prone areas

    Source store.standards.org.au, read

  15. No date yet

    AnnouncedAustralia-wide

    AS 4678-2002 Earth retaining structures

    Source store.standards.org.au, read

What we changed for Moreton Bay

The rules we hold for Moreton Bay, each brought up to date from the page it names, newest first. The summary above reads from them.

  1. Rules

    Read from Moreton Bay development services fees

  2. Rules

    Read from Moreton Bay development services fees

Council notices

No story for Moreton Bay yet.

The sources we read for Moreton Bay

6 sources read for Moreton Bay, the newest on , each below with the day it was last read.

Planning schemes and codes

Fees

Follow Moreton Bay in a feed reader: www.rapidsiteplan.au/site-plan/moreton-bay/feed.xml. Every council and state has one, listed on rule changes by council and state.

RapidSiteplan is design software: you confirm details, measure on site and your certifier or council makes the approval decision. The rule above is general information, not building or legal advice. Boundaries shown are indicative, a surveyor is recommended where exact positions matter.

Serving postcodes 4500 and surrounds.

Cookies and local storage

Essential cookies and local storage keep you signed in and hold your plan. Google Analytics and Microsoft Clarity measure how these public pages are used while you are signed out; untick Analytics to switch them off. No advertising, nothing sold.