Approval and site plan questions
Plain answers to what people ask about council approval and the site plan before they build: council approval, boundary setbacks, overlays and the site plan. Each answer ends with how to read the rules for your own lot.
Plot plan, block plan, lot plan: which names mean the drawing council wants, which mean something else, and how a site plan differs from a floor plan.
What is a site plan? What council expects to see on oneA site plan shows your property from above with boundaries, existing buildings and the proposed structure. This is what councils and certifiers expect on it.
How much does a site plan cost in Australia?What decides the cost of a site plan in Australia: who draws it, how often it changes, and when a surveyor is worth paying for instead.
Land survey plan or site plan: which do you need?A land survey plan fixes where the boundaries legally are; a site plan shows your project on the lot. Which one you need, and what decides a survey’s cost.
Site plan for a DA or council application: how to get oneWhat a council application needs on the site plan, the three ways to get one, and how to draw one yourself, anywhere in Australia.
Can you build over an easement? How to find yoursAn easement is a mapped right over part of your land, usually for drainage or services. How to find easements on your lot, and what building over one involves.
Building over or next to a sewer: build over applicationsBuilding over or adjacent to a sewer needs the consent of the main’s owner. Clearances, footings, stormwater easements and who owns the main in each state.
BAL rating and BAL assessment: what the levels meanA BAL rating is the bushfire attack level a building is designed for, and a BAL assessment sets it for one site. The levels, flame zone and each state’s map.
Flood overlay meaning: what it means for your propertyA flood overlay does not ban building, it changes the questions. What flood mapping means, what councils ask for, and how to check your lot before you design.
Who gives building approval: council or a certifier?Two approvals get called council approval. What each covers, what a private certifier checks, and where the council still decides.
How close to the boundary can I build a house in my state?How close you can build to a boundary depends on the boundary, the height of the wall and your state’s rules. What a setback measures, and each state’s rule.
Site coverage: what it means and how much you can buildSite coverage is the share of your lot under roof: how it is worked out, what counts, where your limit comes from, and why it decides small projects.
What is a planning overlay, and what does it change?An overlay is a mapped layer that adds rules to part of your land: the ones that come up most, what each changes, and how to find which apply to your lot.
Do I need council approval to concrete my backyard?Concreting a yard turns on where the water goes, how much garden is left, the manholes and the levels. What decides it, who decides, and what to draw.
What does a heritage overlay mean for my property?A heritage overlay protects how a place or a street looks, so work the street can see often needs planning approval first. What it covers and who decides.
Can I get council approval after it is built?Most states have a way to sign off work already standing. What the certifier or council checks, what happens if it falls short, and what a buyer should ask.
How do I find my lot and plan number?The lot and plan number identifies your land on every application. Where to find it, what it points to, and why the certifier asks for it.
How do I find my house plans and get them from council?Councils keep building records for many houses. How to ask for them, what they hold, what to do when there are none, and what a site plan needs from them.
Can I draw a site plan from an aerial photo?An aerial photo shows what is built but not where the boundaries run, and its scale is only close. How to turn it into a site plan the certifier can read.
How do I find my wind region?Your wind region comes from where the lot sits on the national wind map, and the class from the ground around it. How to find yours, and why the supplier asks.
How do I find planning applications near me?Councils list development applications on their trackers, and some states keep a portal too. Where to search near you, and what a tracker shows.
How do I draw a site plan for council?Start from the boundaries and their lengths, add what stands on the lot, then the new work with its distance to every boundary, all to one scale.
How do I find the council rules for my property?Three sets of rules decide what you can build on a lot: the council’s planning scheme, the state’s building rules and the overlays mapped over it.
What can I build without council approval in Queensland?In Queensland some small work is exempt from building approval within the limits the state sets. What usually is, what is not, and who decides.
What can I build without a permit in Victoria?In Victoria a small structure can be exempt from a building permit and still need a planning permit. Who decides each, and how to check your lot.
What can I build without approval in Western Australia?In Western Australia some small work needs no building permit and many outbuildings can go ahead without development approval, within limits.
Do I need approval to fill or cut my block?Sometimes. Small earthworks may be exempt, while larger cut or fill, fill in a flood area or work near a boundary can need the council’s approval.
What is DA Form 1, and when is it Form 2?Queensland development applications use the state’s forms: DA Form 1 for development generally, Form 2 for building work only. Which goes with which.
What are acid sulfate soils and can I build on them?Acid sulfate soils are harmless until they are dug up or drained. Where they are mapped, what work brings the question, and who decides what follows.
What is overland flow, and is it a flood overlay?Overland flow is stormwater running across the ground when the drains overflow. How councils map it, what the overlay asks for, and who decides.
What is a special building overlay?A special building overlay marks land in Victoria that stormwater can flood when the drains overflow. What needs a planning permit and who has a say.
What is an existing services plan?An existing services plan shows the sewer, stormwater, water, gas, power and phone lines already on a lot. When you need one and how to find the lines.
Is there a site plan template I can use?A site plan template works as a checklist of the parts and the layout. What every plan carries, how the sheet is set out, and what a template leaves out.
What site plan software can I use on a computer?Any program that holds a true scale can draw a site plan, but none of them knows your lot. What each kind of program does well and how to check the result.
When do I need an owner builder permit?You need an owner builder permit when the value of the work passes the line your state sets. What it covers, what it does not, and who issues it.
Can I see my neighbour’s building plans?You can often read a neighbour’s plans while their application is advertised. How to find them, what stays private, and how to make a submission.
How much does a building certifier cost?Building certifier cost has no set price: most certifiers set their own fee. What the quote covers, what adds to it, and how to compare two of them.
How much does a DA cost in NSW?A DA fee in NSW follows a state scale tied to the estimated cost of the work, and other bills follow it. How DA and CDC fees are worked out and compared.
What is a complying development certificate in NSW?A complying development certificate is one approval for planning and building, for work that meets every fixed standard in NSW. Who issues it, and when.
What is exempt development in NSW?Exempt development is minor work New South Wales lets you build without a DA or a certificate, while it meets every standard. What the standards test.
What does DA approval mean?DA approval means the planning authority has agreed to a development application, usually with conditions. What it allows, and what comes before you build.
When do you need a development application?You need a development application when the planning rules for your lot ask for one, usually because of the zone, an overlay or work past the state’s limits.
Planning permit or building permit in Victoria?Victoria keeps two permits, and backyard work can need one, both or neither. Which work usually takes which, who issues each, and which comes first.
What is ResCode?ResCode is the common name for Victoria’s residential standards on siting, overlooking and overshadowing. What it covers, and who applies it to your work.
What are the R-Codes in WA?The R-Codes are Western Australia’s residential design codes: how homes and outbuildings sit on a lot. The density coding, the setbacks, and who decides.
How do I lodge a PlanSA development application?PlanSA is South Australia’s online planning portal, and development applications are lodged through it. The steps, the two consents, and the public register.
What is notifiable work in Tasmania?Notifiable work is Tasmania’s middle tier of building work: a building surveyor certifies the design and the council is told, without a building permit.
Do I need a rainwater tank, and is the water safe to drink?Which states ask a new home for a rainwater tank, where it sits on the site plan, when it needs approval, and what the first Australian rain study found.
RapidSiteplan reads the council and building rules for your lot from its address, checks the design against them as you place it, and prints the site plan. Site plans and assessments in minutes.