RapidSiteplan

Site plans for Torres, Queensland: drawn in minutes

Need a site plan for a shed, patio, carport, deck, pool or granny flat in Torres? Site plans and assessments in minutes, drawn over the real lot.

Building in Torres

Torres Shire's planning scheme accepts a house and the building work that goes with it, and changes the state siting code in only two ways: height and front setback. In the low density residential zone, a house and its sheds, carports and pools are limited to two storeys and sit a set distance from any front boundary; in the low-medium density zone they may go to three storeys, except on Horn Island, at Tamwoy Town and at Rose Hill.

The zones' other outcomes, such as site cover and side and rear setbacks, apply only to development the scheme assesses, not to a house or its outbuildings, which take those from Queensland's state siting code. The scheme also designates bushfire and flood hazard areas for the building codes. Torres Shire Council lists its development applications online.

What we hold for Torres

For Torres we hold the council’s own rules for:

  • sheds, garden sheds, garages and carports
  • patios, pergolas, louvred roofs, decks and shade sails
  • pools, fences and retaining walls
  • granny flats
  • driveways, water tanks and shipping containers

At each lot we check the state’s mapping for flood, bushfire, landslide, heritage and native vegetation. We also read the council’s application register for past applications on the lot.

Last checked

How approval works in Queensland

In Queensland a building certifier, usually a private one, gives the building approval for work on a house lot, and the council comes in for the parts it controls. The smallest structures are accepted development and need no building approval when they meet the state's standards. Anything larger needs building approval, and a structure that sits closer to a boundary or the street than the siting rules allow also needs the council's agreement to a siting variation; an overlay or the zone in the council's planning scheme can add a planning approval on top. The certifier and the council read the site plan for where the structure sits against each boundary, the house and any easement. Its size, its height and its distance to each boundary decide which way it goes, as per the Queensland Housing Code and the Building Regulation 2021.

Drawing the plan

Type the property address, the lot’s real boundaries load from official land records in Queensland, and you place the structure over the aerial view. The plan prints to scale with boundary lengths, setback distances, a north arrow, a legend, a site coverage table and a title block, as the site plan for a building approval or a DA.

What a certifier in Torres will ask you

How high can a retaining wall and a fence go?

Each takes its own height test, and a retaining wall carrying a fence has its own approval. Both heights go on the sheet for the certifier to read together.

How big can a granny flat be, and how far from the house?

The council caps a granny flat’s floor area, and some councils also limit how far from the house it may stand. The sheet prints the floor area and dimensions the distance to the house.

Is the lot in an overlay, and what is the zoning?

A flood, bushfire, heritage or character overlay can bring a planning approval on top of the building approval, and the zone decides which of the council’s rules apply. The mapped overlays are read at the lot as the structure goes on the plan.

How deep is the pool?

The depth decides whether the water needs a barrier, and the barrier has to be in place before the pool is filled. The barrier is what gets inspected, so the sheet shows where it runs and every gate with its swing.

The figures for your own lot are read in a minute, from its address.

Every question a certifier asks is on the Queensland page.

Changes on the way

Rule changes announced for Torres, for Queensland and for the whole country, the state and national lines in full on the Queensland page, each with the page that says so and the day we read it.

In the next 90 days

Nothing due in the next 90 days that we know of.

Later

  1. CommencesQueensland

    National Construction Code 2025

    Source qbcc.qld.gov.au, read

  2. CommencesAustralia-wide

    ABCB Housing Provisions 2025 (with NCC 2025)

    Source abcb.gov.au, read

  3. CommencesAustralia-wide

    AS 1926.1:2024 Swimming pool safety barriers

    Source ncc.abcb.gov.au, read

  4. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 10.8

    Source ncc.abcb.gov.au, read

  5. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 9.2

    Source ncc.abcb.gov.au, read

  6. CommencesAustralia-wide

    NCC 2025 Volume Two Part H6, Specification 42 and Housing Provisions Section 13

    Source ncc.abcb.gov.au, read

  7. CommencesAustralia-wide

    NCC 2025 Volume Two Part H8

    Source ncc.abcb.gov.au, read

  8. ExhibitedQueensland

    State Planning Policy (draft)

    Source statements.qld.gov.au, read

  9. AdoptedAustralia-wide

    National Construction Code, residential pause

    Source treasury.gov.au, read

  10. CommencesQueensland

    Queensland Housing Code

    Source business.qld.gov.au, read

  11. AnnouncedAustralia-wide

    National Construction Code, next edition

    Source abcb.gov.au, read

  12. No date yet

    AdoptedQueensland

    State-wide Bushfire Hazard Area (Bushfire Prone Area) mapping, published 2026

    Source tiles.arcgis.com, read

  13. No date yet

    AnnouncedAustralia-wide

    AS 3959:2018 Construction of buildings in bushfire prone areas

    Source store.standards.org.au, read

  14. No date yet

    AnnouncedAustralia-wide

    AS 4678-2002 Earth retaining structures

    Source store.standards.org.au, read

What we changed for Torres

The rules we hold for Torres, each brought up to date from the page it names, newest first. The summary above reads from them.

  1. Council rules

    Read from torres.qld.gov.au

  2. Planning scheme edition

    Read from torres.qld.gov.au

Council notices

No story for Torres yet.

The sources we read for Torres

No page of Torres’s own is on our watch yet.

Follow Torres in a feed reader: www.rapidsiteplan.au/site-plan/torres/feed.xml. Every council and state has one, listed on rule changes by council and state.

RapidSiteplan is design software: you confirm details, measure on site and your certifier or council makes the approval decision. The rule above is general information, not building or legal advice. Boundaries shown are indicative, a surveyor is recommended where exact positions matter.

Cookies and local storage

Essential cookies and local storage keep you signed in and hold your plan. Google Analytics and Microsoft Clarity measure how these public pages are used while you are signed out; untick Analytics to switch them off. No advertising, nothing sold.