Site plans for Torres Strait Island, Queensland: drawn in minutes
Need a site plan for a shed, patio, carport, deck, pool or granny flat in Torres Strait Island? Site plans and assessments in minutes, drawn over the real lot.
Building in Torres Strait Island
Across the islands covered by the Zenadth Kes planning scheme, the Torres Strait Island Regional Council states there are no building assessment provisions, and the scheme regulates no building work. It does designate bushfire prone, flood hazard and storm tide hazard areas and declares a defined flood level, which the building codes then use.
A dwelling house is accepted development in the township zone, and in the environmental management and conservation zone where it sits outside the landslide, bushfire, flood and coastal hazard areas and areas of high environmental value. A house and its sheds, carports and pools take their boundary setbacks and site cover from Queensland's state siting code.
Applications are recorded on the Remote Indigenous Land and Infrastructure Program Office register.
What we hold for Torres Strait Island
For Torres Strait Island we hold the council’s own rules for:
- sheds, garden sheds, garages and carports
- patios, pergolas, louvred roofs, decks and shade sails
- pools, fences and retaining walls
- granny flats
- driveways, water tanks and shipping containers
At each lot we check the state’s mapping for flood, bushfire, landslide, heritage and native vegetation. We also read the council’s application register for past applications on the lot.
Last checked
How approval works in Queensland
In Queensland a building certifier, usually a private one, gives the building approval for work on a house lot, and the council comes in for the parts it controls. The smallest structures are accepted development and need no building approval when they meet the state's standards. Anything larger needs building approval, and a structure that sits closer to a boundary or the street than the siting rules allow also needs the council's agreement to a siting variation; an overlay or the zone in the council's planning scheme can add a planning approval on top. The certifier and the council read the site plan for where the structure sits against each boundary, the house and any easement. Its size, its height and its distance to each boundary decide which way it goes, as per the Queensland Housing Code and the Building Regulation 2021.
Drawing the plan
Type the property address, the lot’s real boundaries load from official land records in Queensland, and you place the structure over the aerial view. The plan prints to scale with boundary lengths, setback distances, a north arrow, a legend, a site coverage table and a title block, as the site plan for a building approval or a DA.
What a certifier in Torres Strait Island will ask you
How big can a granny flat be, and how far from the house?
The council caps a granny flat’s floor area, and some councils also limit how far from the house it may stand. The sheet prints the floor area and dimensions the distance to the house.
How deep is the pool?
The depth decides whether the water needs a barrier, and the barrier has to be in place before the pool is filled. The barrier is what gets inspected, so the sheet shows where it runs and every gate with its swing.
Is the lot in an overlay, and what is the zoning?
A flood, bushfire, heritage or character overlay can bring a planning approval on top of the building approval, and the zone decides which of the council’s rules apply. The mapped overlays are read at the lot as the structure goes on the plan.
Is the patio a pergola, a louvred roof or a solid roof?
An open pergola and a roofed patio are treated differently near the boundary, and louvres that shut to shed water count as a roof. Roofed, it also adds to the site cover total on the sheet.
The figures for your own lot are read in a minute, from its address.
Every question a certifier asks is on the Queensland page.
Changes on the way
Rule changes announced for Torres Strait Island, for Queensland and for the whole country, the state and national lines in full on the Queensland page, each with the page that says so and the day we read it.
In the next 90 days
Nothing due in the next 90 days that we know of.
Later
-
National Construction Code 2025
Source qbcc.qld.gov.au, read
-
ABCB Housing Provisions 2025 (with NCC 2025)
Source abcb.gov.au, read
-
AS 1926.1:2024 Swimming pool safety barriers
Source ncc.abcb.gov.au, read
-
NCC 2025 Housing Provisions Part 10.8
Source ncc.abcb.gov.au, read
-
NCC 2025 Housing Provisions Part 9.2
Source ncc.abcb.gov.au, read
-
NCC 2025 Volume Two Part H6, Specification 42 and Housing Provisions Section 13
Source ncc.abcb.gov.au, read
-
NCC 2025 Volume Two Part H8
Source ncc.abcb.gov.au, read
-
State Planning Policy (draft)
Source statements.qld.gov.au, read
-
National Construction Code, residential pause
Source treasury.gov.au, read
-
Queensland Housing Code
Source business.qld.gov.au, read
-
National Construction Code, next edition
Source abcb.gov.au, read
-
No date yet
State-wide Bushfire Hazard Area (Bushfire Prone Area) mapping, published 2026
Source tiles.arcgis.com, read
-
No date yet
AS 3959:2018 Construction of buildings in bushfire prone areas
Source store.standards.org.au, read
-
No date yet
AS 4678-2002 Earth retaining structures
Source store.standards.org.au, read
What we changed for Torres Strait Island
The rules we hold for Torres Strait Island, each brought up to date from the page it names, newest first. The summary above reads from them.
-
Planning scheme edition
Read from The Zenadth Kes Planning Scheme
-
Council rules
Read from Zenadth Kes Planning Scheme Part 5 Tables of assessment
Council notices
No story for Torres Strait Island yet.
The sources we read for Torres Strait Island
4 sources read for Torres Strait Island, the newest on , each below with the day it was last read.
Planning schemes and codes
-
The Zenadth Kes Planning Scheme
No change
Follow Torres Strait Island in a feed reader: www.rapidsiteplan.au/site-plan/torres-strait-island/feed.xml. Every council and state has one, listed on rule changes by council and state.
RapidSiteplan is design software: you confirm details, measure on site and your certifier or council makes the approval decision. The rule above is general information, not building or legal advice. Boundaries shown are indicative, a surveyor is recommended where exact positions matter.
Plans for the job
Questions people ask
More councils in Queensland