RapidSiteplan

Site plans for Narrogin, Western Australia: drawn in minutes

Need a site plan for a shed, patio, carport, deck, pool or granny flat in Narrogin? Site plans and assessments in minutes, drawn over the real lot.

Building in Narrogin

On a Narrogin lot, open space is the limit people forget: each density code sets a minimum, and every roofed structure counts against it. Most siting numbers come from the state's housing codes, but the shire can set its own figures for outbuilding sizes, site works, street setbacks, boundary walls and garage and carport setbacks through a local planning policy. Before drawing anything, look at the state's heritage, native vegetation, landslide and bushfire mapping, which applies across Narrogin.

Keep a shed within the state's standard outbuilding figures and off any heritage place, and development approval is usually not required; go bigger and the shire assesses it. For applications lodged near you, the shire office is the place to ask. Pools of any real depth need a permit and a barrier, with the barrier inspected on a regular cycle. Where a sewer runs through the lot, Water Corporation keeps a clear access way round its maintenance structures and headroom under any roof, and expects to sign off work near its pipes before it starts.

What we hold for Narrogin

For Narrogin we hold the council’s own rules for:

  • sheds, garden sheds, garages and carports
  • patios, pergolas, louvred roofs, decks and shade sails
  • pools, fences and retaining walls
  • granny flats
  • driveways, water tanks and shipping containers

At each lot we check the state’s mapping for flood, bushfire, landslide, heritage and native vegetation.

Last checked

How approval works in Western Australia

In Western Australia the local government is the permit authority and issues the building permit, and an application can arrive with the design already checked by a private registered building surveyor, who issues a certificate of design compliance. Some small structures need no building permit, but every structure still has to meet the planning side: on a house lot, the Residential Design Codes and the local planning policies. Work that meets their deemed-to-comply standards, on a place that is not heritage protected, needs no planning approval; work that does not goes to the local government as a development application, judged against the design principles. The site plan shows the structure's distance to each boundary, its wall height and the open space left on the lot. The lot's density coding decides how close a structure can go, as per the Residential Design Codes (R-Codes) and the Building Act 2011.

Drawing the plan

Type the property address, the lot’s real boundaries load from official land records in Western Australia, and you place the structure over the aerial view. The plan prints to scale with boundary lengths, setback distances, a north arrow, a legend, a site coverage table and a title block, as the site plan for a building permit or a development application.

What a certifier in Narrogin will ask you

How high can a retaining wall and a fence go?

Each takes its own height test, and a retaining wall carrying a fence has its own approval. Both heights go on the sheet for the certifier to read together.

How big can a granny flat be, and how far from the house?

The council caps a granny flat’s floor area, and some councils also limit how far from the house it may stand. The sheet prints the floor area and dimensions the distance to the house.

Is the lot in an overlay, and what is the zoning?

A flood, bushfire, heritage or character overlay can bring a planning approval on top of the building approval, and the zone decides which of the council’s rules apply. The mapped overlays are read at the lot as the structure goes on the plan.

How deep is the pool?

The depth decides whether the water needs a barrier, and the barrier has to be in place before the pool is filled. The barrier is what gets inspected, so the sheet shows where it runs and every gate with its swing.

The figures for your own lot are read in a minute, from its address.

Every question a certifier asks is on the Western Australia page.

Changes on the way

Rule changes announced for Narrogin, for Western Australia and for the whole country, the state and national lines in full on the Western Australia page, each with the page that says so and the day we read it.

In the next 90 days

Nothing due in the next 90 days that we know of.

Later

  1. ExhibitedWestern Australia

    Residential Design Codes (review), consultation draft

    Source wa.gov.au, read

  2. CommencesWestern Australia

    Building Regulations 2012, Schedules 4 and 5 (Building Amendment Regulations (No. 2) 2026)

    Source legislation.wa.gov.au, read

  3. CommencesWestern Australia

    Building Code of Australia 2025, WA addition (Industry Bulletin 174)

    Source wa.gov.au, read

  4. CommencesWestern Australia

    National Construction Code 2025

    Source ncc.abcb.gov.au, read

  5. CommencesAustralia-wide

    ABCB Housing Provisions 2025 (with NCC 2025)

    Source abcb.gov.au, read

  6. CommencesAustralia-wide

    AS 1926.1:2024 Swimming pool safety barriers

    Source ncc.abcb.gov.au, read

  7. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 10.8

    Source ncc.abcb.gov.au, read

  8. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 9.2

    Source ncc.abcb.gov.au, read

  9. CommencesAustralia-wide

    NCC 2025 Volume Two Part H6, Specification 42 and Housing Provisions Section 13

    Source ncc.abcb.gov.au, read

  10. CommencesAustralia-wide

    NCC 2025 Volume Two Part H8

    Source ncc.abcb.gov.au, read

  11. AnnouncedWestern Australia

    Residential Design Codes (review), changes in effect

    Source wa.gov.au, read

  12. AdoptedAustralia-wide

    National Construction Code, residential pause

    Source treasury.gov.au, read

  13. AnnouncedAustralia-wide

    National Construction Code, next edition

    Source abcb.gov.au, read

  14. No date yet

    AdoptedWestern Australia

    Bushfire Prone Areas (OBRM-026)

    Source services.slip.wa.gov.au, read

  15. No date yet

    AnnouncedAustralia-wide

    AS 3959:2018 Construction of buildings in bushfire prone areas

    Source store.standards.org.au, read

  16. No date yet

    AnnouncedAustralia-wide

    AS 4678-2002 Earth retaining structures

    Source store.standards.org.au, read

Date passed, next step not seen yet

  1. CommencesWestern Australia

    Building Code of Australia 2025, WA additions for private swimming pools (Industry Bulletin 175)

    Source wa.gov.au, read

What we changed for Narrogin

The rules we hold for Narrogin, each brought up to date from the page it names, newest first. The summary above reads from them.

  1. Council rules

    Read from WA R-Codes Volume 1

Council notices

No story for Narrogin yet.

The sources we read for Narrogin

No page of Narrogin’s own is on our watch yet.

Follow Narrogin in a feed reader: www.rapidsiteplan.au/site-plan/narrogin/feed.xml. Every council and state has one, listed on rule changes by council and state.

RapidSiteplan is design software: you confirm details, measure on site and your certifier or council makes the approval decision. The rule above is general information, not building or legal advice. Boundaries shown are indicative, a surveyor is recommended where exact positions matter.

Cookies and local storage

Essential cookies and local storage keep you signed in and hold your plan. Google Analytics and Microsoft Clarity measure how these public pages are used while you are signed out; untick Analytics to switch them off. No advertising, nothing sold.