RapidSiteplan

Site plans for Carnamah, Western Australia: drawn in minutes

Need a site plan for a shed, patio, carport, deck, pool or granny flat in Carnamah? Site plans and assessments in minutes, drawn over the real lot.

Building in Carnamah

Check the hazard maps first in Carnamah: the state's native vegetation, landslide and bushfire layers cover the district, and a lot inside one can face extra requirements. The state's residential codes do the heavy lifting here, applied through the shire's planning scheme, though local policy may adjust street setbacks, outbuilding sizes and building height. Outbuildings within the statewide deemed-to-comply figures, away from heritage places, generally don't need development approval, though a local policy can move those caps.

For applications lodged near you, the shire office is the place to ask. Patios and carports count against the open space your lot's density code requires, which tends to bite first on smaller lots. If Water Corporation has sewer assets on your lot, plan around its access way and headroom requirements and get its sign-off before building near the pipes.

What we hold for Carnamah

For Carnamah we hold the council’s own rules for:

  • sheds, garden sheds, garages and carports
  • patios, pergolas, louvred roofs, decks and shade sails
  • pools, fences and retaining walls
  • granny flats
  • driveways, water tanks and shipping containers

At each lot we check the state’s mapping for flood, bushfire, landslide, heritage and native vegetation.

Last checked

How approval works in Western Australia

In Western Australia the local government is the permit authority and issues the building permit, and an application can arrive with the design already checked by a private registered building surveyor, who issues a certificate of design compliance. Some small structures need no building permit, but every structure still has to meet the planning side: on a house lot, the Residential Design Codes and the local planning policies. Work that meets their deemed-to-comply standards, on a place that is not heritage protected, needs no planning approval; work that does not goes to the local government as a development application, judged against the design principles. The site plan shows the structure's distance to each boundary, its wall height and the open space left on the lot. The lot's density coding decides how close a structure can go, as per the Residential Design Codes (R-Codes) and the Building Act 2011.

Drawing the plan

Type the property address, the lot’s real boundaries load from official land records in Western Australia, and you place the structure over the aerial view. The plan prints to scale with boundary lengths, setback distances, a north arrow, a legend, a site coverage table and a title block, as the site plan for a building permit or a development application.

What a certifier in Carnamah will ask you

Is the patio a pergola, a louvred roof or a solid roof?

An open pergola and a roofed patio are treated differently near the boundary, and louvres that shut to shed water count as a roof. Roofed, it also adds to the site cover total on the sheet.

Is the carport open, or closed in?

How open the carport is changes whether it needs a fire rated wall near the boundary, and a roller door or a later enclosure reopens the question. A shed never takes the open carport exemption.

Is the lot in an overlay, and what is the zoning?

A flood, bushfire, heritage or character overlay can bring a planning approval on top of the building approval, and the zone decides which of the council’s rules apply. The mapped overlays are read at the lot as the structure goes on the plan.

How high can a retaining wall and a fence go?

Each takes its own height test, and a retaining wall carrying a fence has its own approval. Both heights go on the sheet for the certifier to read together.

The figures for your own lot are read in a minute, from its address.

Every question a certifier asks is on the Western Australia page.

Changes on the way

Rule changes announced for Carnamah, for Western Australia and for the whole country, the state and national lines in full on the Western Australia page, each with the page that says so and the day we read it.

In the next 90 days

Nothing due in the next 90 days that we know of.

Later

  1. ExhibitedWestern Australia

    Residential Design Codes (review), consultation draft

    Source wa.gov.au, read

  2. CommencesWestern Australia

    Building Regulations 2012, Schedules 4 and 5 (Building Amendment Regulations (No. 2) 2026)

    Source legislation.wa.gov.au, read

  3. CommencesWestern Australia

    Building Code of Australia 2025, WA addition (Industry Bulletin 174)

    Source wa.gov.au, read

  4. CommencesWestern Australia

    National Construction Code 2025

    Source ncc.abcb.gov.au, read

  5. CommencesAustralia-wide

    ABCB Housing Provisions 2025 (with NCC 2025)

    Source abcb.gov.au, read

  6. CommencesAustralia-wide

    AS 1926.1:2024 Swimming pool safety barriers

    Source ncc.abcb.gov.au, read

  7. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 10.8

    Source ncc.abcb.gov.au, read

  8. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 9.2

    Source ncc.abcb.gov.au, read

  9. CommencesAustralia-wide

    NCC 2025 Volume Two Part H6, Specification 42 and Housing Provisions Section 13

    Source ncc.abcb.gov.au, read

  10. CommencesAustralia-wide

    NCC 2025 Volume Two Part H8

    Source ncc.abcb.gov.au, read

  11. AnnouncedWestern Australia

    Residential Design Codes (review), changes in effect

    Source wa.gov.au, read

  12. AdoptedAustralia-wide

    National Construction Code, residential pause

    Source treasury.gov.au, read

  13. AnnouncedAustralia-wide

    National Construction Code, next edition

    Source abcb.gov.au, read

  14. No date yet

    AdoptedWestern Australia

    Bushfire Prone Areas (OBRM-026)

    Source services.slip.wa.gov.au, read

  15. No date yet

    AnnouncedAustralia-wide

    AS 3959:2018 Construction of buildings in bushfire prone areas

    Source store.standards.org.au, read

  16. No date yet

    AnnouncedAustralia-wide

    AS 4678-2002 Earth retaining structures

    Source store.standards.org.au, read

Date passed, next step not seen yet

  1. CommencesWestern Australia

    Building Code of Australia 2025, WA additions for private swimming pools (Industry Bulletin 175)

    Source wa.gov.au, read

What we changed for Carnamah

The rules we hold for Carnamah, each brought up to date from the page it names, newest first. The summary above reads from them.

  1. Council rules

    Read from WA R-Codes Volume 1

Council notices

No story for Carnamah yet.

The sources we read for Carnamah

No page of Carnamah’s own is on our watch yet.

Follow Carnamah in a feed reader: www.rapidsiteplan.au/site-plan/carnamah/feed.xml. Every council and state has one, listed on rule changes by council and state.

RapidSiteplan is design software: you confirm details, measure on site and your certifier or council makes the approval decision. The rule above is general information, not building or legal advice. Boundaries shown are indicative, a surveyor is recommended where exact positions matter.

Cookies and local storage

Essential cookies and local storage keep you signed in and hold your plan. Google Analytics and Microsoft Clarity measure how these public pages are used while you are signed out; untick Analytics to switch them off. No advertising, nothing sold.