RapidSiteplan

Site plans for Mount Remarkable, South Australia: drawn in minutes

Need a site plan for a shed, patio, carport, deck, pool or granny flat in Mount Remarkable? Site plans and assessments in minutes, drawn over the real lot.

Building in Mount Remarkable

Mount Remarkable follows the state Planning and Design Code for each zone, and any Technical and Numeric Variations for parts of the district show on the planning atlas.

A shipping container on a residential lot is development in South Australia, needing planning consent and building consent; there's no container exclusion, and a standard container fails the small shed test. Rainwater tanks plumbed to the roof get more room, especially inside the bushfire overlay. The state's bushfire, flood and vegetation mapping is read for each lot. Applications are lodged through PlanSA.

What we hold for Mount Remarkable

For Mount Remarkable we hold the council’s own rules for:

  • sheds, garden sheds, garages and carports
  • patios, pergolas, louvred roofs, decks and shade sails
  • pools, fences and retaining walls
  • granny flats
  • driveways, water tanks and shipping containers

At each lot we check the state’s mapping for flood, bushfire, heritage and native vegetation. We also read the council’s application register for past applications on the lot.

Last checked

How approval works in South Australia

In South Australia development approval brings together planning consent, against the Planning and Design Code, and building consent, against the building rules, both applied for through the PlanSA portal. Some small structures are not development at all and need neither. Others are accepted development, which needs building consent but no planning assessment; deemed-to-satisfy development gets planning consent when it meets the Code's standards; and performance assessed development is weighed on its merits. The council, or an accredited professional such as a private certifier, issues each consent. The assessor reads the site plan for the structure's size, its distance to each boundary and how much of the lot is covered. The zone and the overlays on the lot decide the pathway, as per the Planning, Development and Infrastructure Act 2016 and the Planning and Design Code.

Drawing the plan

Type the property address, the lot’s real boundaries load from official land records in South Australia, and you place the structure over the aerial view. The plan prints to scale with boundary lengths, setback distances, a north arrow, a legend, a site coverage table and a title block, as the site plan for a development approval.

What a certifier in Mount Remarkable will ask you

How deep is the pool?

The depth decides whether the water needs a barrier, and the barrier has to be in place before the pool is filled. The barrier is what gets inspected, so the sheet shows where it runs and every gate with its swing.

Is the patio a pergola, a louvred roof or a solid roof?

An open pergola and a roofed patio are treated differently near the boundary, and louvres that shut to shed water count as a roof. Roofed, it also adds to the site cover total on the sheet.

Is the lot in an overlay, and what is the zoning?

A flood, bushfire, heritage or character overlay can bring a planning approval on top of the building approval, and the zone decides which of the council’s rules apply. The mapped overlays are read at the lot as the structure goes on the plan.

Is the carport open, or closed in?

How open the carport is changes whether it needs a fire rated wall near the boundary, and a roller door or a later enclosure reopens the question. A shed never takes the open carport exemption.

The figures for your own lot are read in a minute, from its address.

Every question a certifier asks is on the South Australia page.

Changes on the way

Rule changes announced for Mount Remarkable, for South Australia and for the whole country, the state and national lines in full on the South Australia page, each with the page that says so and the day we read it.

In the next 90 days

Nothing due in the next 90 days that we know of.

Later

  1. CommencesSouth Australia

    National Construction Code 2025, Building Code

    Source plan.sa.gov.au, read

  2. CommencesAustralia-wide

    ABCB Housing Provisions 2025 (with NCC 2025)

    Source abcb.gov.au, read

  3. CommencesAustralia-wide

    AS 1926.1:2024 Swimming pool safety barriers

    Source ncc.abcb.gov.au, read

  4. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 10.8

    Source ncc.abcb.gov.au, read

  5. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 9.2

    Source ncc.abcb.gov.au, read

  6. CommencesAustralia-wide

    NCC 2025 Volume Two Part H6, Specification 42 and Housing Provisions Section 13

    Source ncc.abcb.gov.au, read

  7. CommencesAustralia-wide

    NCC 2025 Volume Two Part H8

    Source ncc.abcb.gov.au, read

  8. AdoptedAustralia-wide

    National Construction Code, residential pause

    Source treasury.gov.au, read

  9. AnnouncedAustralia-wide

    National Construction Code, next edition

    Source abcb.gov.au, read

  10. No date yet

    ExhibitedSouth Australia

    State-wide Bushfire Hazards Overlay Code Amendment

    Source yoursay.sa.gov.au, read

  11. No date yet

    ExhibitedSouth Australia

    State-wide Flood Hazard Code Amendment

    Source yoursay.sa.gov.au, read

  12. No date yet

    AnnouncedAustralia-wide

    AS 3959:2018 Construction of buildings in bushfire prone areas

    Source store.standards.org.au, read

  13. No date yet

    AnnouncedAustralia-wide

    AS 4678-2002 Earth retaining structures

    Source store.standards.org.au, read

What we changed for Mount Remarkable

The rules we hold for Mount Remarkable, each brought up to date from the page it names, newest first. The summary above reads from them.

  1. Council rules

    Read from plan.sa.gov.au

Council notices

No story for Mount Remarkable yet.

The sources we read for Mount Remarkable

No page of Mount Remarkable’s own is on our watch yet.

Follow Mount Remarkable in a feed reader: www.rapidsiteplan.au/site-plan/mount-remarkable/feed.xml. Every council and state has one, listed on rule changes by council and state.

RapidSiteplan is design software: you confirm details, measure on site and your certifier or council makes the approval decision. The rule above is general information, not building or legal advice. Boundaries shown are indicative, a surveyor is recommended where exact positions matter.

Cookies and local storage

Essential cookies and local storage keep you signed in and hold your plan. Google Analytics and Microsoft Clarity measure how these public pages are used while you are signed out; untick Analytics to switch them off. No advertising, nothing sold.