Site plans for Ku-ring-gai, New South Wales: drawn in minutes
Need a site plan for a shed, patio, carport, deck, pool or granny flat in Ku-ring-gai? Site plans and assessments in minutes, drawn over the real lot.
Towns and suburbs in Ku-ring-gai include Turramurra, Wahroonga, Gordon, Pymble and Lindfield.
Building in Ku-ring-gai
Ku-ring-gai sets deep front setbacks, and they depend on which side of the street the house is on: the high side sits further back than the low side, and a two-storey house must average deeper again. The rear setback is generous on deep sites and a share of the depth on shallower ones.
Side setbacks widen for two storeys, and on wider sites they become a share of the site width. Built-upon area is capped by lot size and tightens slightly for two-storey homes, with a separate cap inside the front setback. A detached garage keeps more distance from side and rear boundaries than a detached carport, and any garage or carport seen from the street has a width limit.
The council maps flood itself, and residents of Turramurra, Wahroonga, Gordon or Pymble can follow applications on the Ku-ring-gai application tracker.
What we hold for Ku-ring-gai
For Ku-ring-gai we hold the council’s own rules for:
- sheds, garden sheds, garages and carports
- patios, pergolas, louvred roofs, decks and shade sails
- pools, fences and retaining walls
- granny flats
- driveways, water tanks and shipping containers
We also hold its current fee schedule.
At each lot we check the council’s own mapping for flood, and the state’s mapping for flood, bushfire, landslide, heritage and native vegetation. We also read the council’s application register for past applications on the lot.
Last checked
How approval works in New South Wales
In New South Wales a small structure goes through the planning pathway it fits. Exempt development needs no approval and nothing is lodged, but the structure has to meet every exempt standard and the land must not be excluded from it. Complying development is a fast approval: a complying development certificate from a registered certifier or the council, for work that meets the state's complying standards. Anything else needs a development application to the council, assessed against its local environmental plan and development control plan. The certifier or the council reads the site plan for the structure's size and its distance to each boundary and the house, and for exempt work the plan is the owner's own record. Size, height, distance to each boundary and the land itself decide the pathway, as per the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008.
Drawing the plan
Type the property address, the lot’s real boundaries load from official land records in New South Wales, and you place the structure over the aerial view. The plan prints to scale with boundary lengths, setback distances, a north arrow, a legend, a site coverage table and a title block, as the site plan for a DA or a complying development certificate.
What a certifier in Ku-ring-gai will ask you
How deep is the pool?
The depth decides whether the water needs a barrier, and the barrier has to be in place before the pool is filled. The barrier is what gets inspected, so the sheet shows where it runs and every gate with its swing.
Is the patio a pergola, a louvred roof or a solid roof?
An open pergola and a roofed patio are treated differently near the boundary, and louvres that shut to shed water count as a roof. Roofed, it also adds to the site cover total on the sheet.
Is the lot in an overlay, and what is the zoning?
A flood, bushfire, heritage or character overlay can bring a planning approval on top of the building approval, and the zone decides which of the council’s rules apply. The mapped overlays are read at the lot as the structure goes on the plan.
Is the carport open, or closed in?
How open the carport is changes whether it needs a fire rated wall near the boundary, and a roller door or a later enclosure reopens the question. A shed never takes the open carport exemption.
The figures for your own lot are read in a minute, from its address.
Every question a certifier asks is on the New South Wales page.
Changes on the way
Rule changes announced for Ku-ring-gai, for New South Wales and for the whole country, the state and national lines in full on the New South Wales page, each with the page that says so and the day we read it.
In the next 90 days
-
Codes SEPP and the complying development variations pathway
Source planningportal.nsw.gov.au, read
Later
-
National Construction Code 2025
Source nsw.gov.au, read
-
ABCB Housing Provisions 2025 (with NCC 2025)
Source abcb.gov.au, read
-
AS 1926.1:2024 Swimming pool safety barriers
Source ncc.abcb.gov.au, read
-
NCC 2025 Housing Provisions Part 10.8
Source ncc.abcb.gov.au, read
-
NCC 2025 Housing Provisions Part 9.2
Source ncc.abcb.gov.au, read
-
NCC 2025 Volume Two Part H6, Specification 42 and Housing Provisions Section 13
Source ncc.abcb.gov.au, read
-
NCC 2025 Volume Two Part H8
Source ncc.abcb.gov.au, read
-
National Construction Code, residential pause
Source treasury.gov.au, read
-
National Construction Code, next edition
Source abcb.gov.au, read
-
No date yet
Building (Approvals and Practitioners) Act 2026
Source nsw.gov.au, read
-
No date yet
Planning for Bush Fire Protection 2026
Source rfs.nsw.gov.au, read
-
No date yet
Standard and model conditions of consent (explanation of intended effect)
Source planningportal.nsw.gov.au, read
-
No date yet
Statewide low rise housing code and targeted assessment (discussion paper)
Source planningportal.nsw.gov.au, read
-
No date yet
AS 3959:2018 Construction of buildings in bushfire prone areas
Source store.standards.org.au, read
-
No date yet
AS 4678-2002 Earth retaining structures
Source store.standards.org.au, read
What we changed for Ku-ring-gai
The rules we hold for Ku-ring-gai, each brought up to date from the page it names, newest first. The summary above reads from them.
-
Council rules
Read from krg.nsw.gov.au
Council notices
No story for Ku-ring-gai yet.
The sources we read for Ku-ring-gai
1 source read for Ku-ring-gai, the newest on , each below with the day it was last read.
Fees
Follow Ku-ring-gai in a feed reader: www.rapidsiteplan.au/site-plan/ku-ring-gai/feed.xml. Every council and state has one, listed on rule changes by council and state.
RapidSiteplan is design software: you confirm details, measure on site and your certifier or council makes the approval decision. The rule above is general information, not building or legal advice. Boundaries shown are indicative, a surveyor is recommended where exact positions matter.
Plans for the job
Questions people ask
More councils in New South Wales