Need a site plan for a shed, patio, carport, deck, pool or granny flat in Griffith? Site plans and assessments in minutes, drawn over the real lot.

Building in Griffith

Griffith allows a slightly shallower front setback only in limited cases: on a justified variation, or in the Collina and Lake Wyangan growth areas. Otherwise a house sits a set distance back, with the garage further back again, and on a corner both the house and garage keep reduced setbacks to the side road.

Upper storeys keep wider side and rear gaps than the ground floor, and a house has a height limit. Detached outbuildings, from sheds and garages to carports and gazebos, sit behind the building line, close to one side or rear boundary and a little further from the other, with a floor area cap tied to lot size and a height limit. On rural-residential lots, outbuildings share a site cover cap.

A share of every site is landscaped, and pools keep a small gap from side and rear boundaries. Griffith City Council takes applications through the NSW Planning Portal.

What we hold for Griffith

For Griffith we hold the council’s own rules for:

  • sheds, garden sheds, garages and carports
  • patios, pergolas, louvred roofs, decks and shade sails
  • pools, fences and retaining walls
  • granny flats
  • driveways, water tanks and shipping containers

At each lot we check the state’s mapping for flood, bushfire, landslide, heritage and native vegetation. We also read the council’s application register for past applications on the lot.

Last checked

How approval works in New South Wales

In New South Wales a small structure goes through the planning pathway it fits. Exempt development needs no approval and nothing is lodged, but the structure has to meet every exempt standard and the land must not be excluded from it. Complying development is a fast approval: a complying development certificate from a registered certifier or the council, for work that meets the state's complying standards. Anything else needs a development application to the council, assessed against its local environmental plan and development control plan. The certifier or the council reads the site plan for the structure's size and its distance to each boundary and the house, and for exempt work the plan is the owner's own record. Size, height, distance to each boundary and the land itself decide the pathway, as per the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008.

Drawing the plan

Type the property address, the lot’s real boundaries load from official land records in New South Wales, and you place the structure over the aerial view. The plan prints to scale with boundary lengths, setback distances, a north arrow, a legend, a site coverage table and a title block, as the site plan for a DA or a complying development certificate.

What a certifier in Griffith will ask you

How deep is the pool?

The depth decides whether the water needs a barrier, and the barrier has to be in place before the pool is filled. The barrier is what gets inspected, so the sheet shows where it runs and every gate with its swing.

Is the patio a pergola, a louvred roof or a solid roof?

An open pergola and a roofed patio are treated differently near the boundary, and louvres that shut to shed water count as a roof. Roofed, it also adds to the site cover total on the sheet.

Is the lot in an overlay, and what is the zoning?

A flood, bushfire, heritage or character overlay can bring a planning approval on top of the building approval, and the zone decides which of the council’s rules apply. The mapped overlays are read at the lot as the structure goes on the plan.

Is the carport open, or closed in?

How open the carport is changes whether it needs a fire rated wall near the boundary, and a roller door or a later enclosure reopens the question. A shed never takes the open carport exemption.

The figures for your own lot are read in a minute, from its address.

Every question a certifier asks is on the New South Wales page.

Changes on the way

Rule changes announced for Griffith, for New South Wales and for the whole country, the state and national lines in full on the New South Wales page, each with the page that says so and the day we read it.

In the next 90 days

  1. ExhibitedNew South Wales

    Codes SEPP and the complying development variations pathway

    Source planningportal.nsw.gov.au, read

Later

  1. CommencesNew South Wales

    National Construction Code 2025

    Source nsw.gov.au, read

  2. CommencesAustralia-wide

    ABCB Housing Provisions 2025 (with NCC 2025)

    Source abcb.gov.au, read

  3. CommencesAustralia-wide

    AS 1926.1:2024 Swimming pool safety barriers

    Source ncc.abcb.gov.au, read

  4. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 10.8

    Source ncc.abcb.gov.au, read

  5. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 9.2

    Source ncc.abcb.gov.au, read

  6. CommencesAustralia-wide

    NCC 2025 Volume Two Part H6, Specification 42 and Housing Provisions Section 13

    Source ncc.abcb.gov.au, read

  7. CommencesAustralia-wide

    NCC 2025 Volume Two Part H8

    Source ncc.abcb.gov.au, read

  8. AdoptedAustralia-wide

    National Construction Code, residential pause

    Source treasury.gov.au, read

  9. AnnouncedAustralia-wide

    National Construction Code, next edition

    Source abcb.gov.au, read

  10. No date yet

    AdoptedNew South Wales

    Building (Approvals and Practitioners) Act 2026

    Source nsw.gov.au, read

  11. No date yet

    ExhibitedNew South Wales

    Planning for Bush Fire Protection 2026

    Source rfs.nsw.gov.au, read

  12. No date yet

    ExhibitedNew South Wales

    Standard and model conditions of consent (explanation of intended effect)

    Source planningportal.nsw.gov.au, read

  13. No date yet

    ExhibitedNew South Wales

    Statewide low rise housing code and targeted assessment (discussion paper)

    Source planningportal.nsw.gov.au, read

  14. No date yet

    AnnouncedAustralia-wide

    AS 3959:2018 Construction of buildings in bushfire prone areas

    Source store.standards.org.au, read

  15. No date yet

    AnnouncedAustralia-wide

    AS 4678-2002 Earth retaining structures

    Source store.standards.org.au, read

What we changed for Griffith

The rules we hold for Griffith, each brought up to date from the page it names, newest first. The summary above reads from them.

  1. Council rules

    Read from griffith.nsw.gov.au

Council notices

No story for Griffith yet.

The sources we read for Griffith

1 source read for Griffith, the newest on , each below with the day it was last read.

Planning schemes and codes

Follow Griffith in a feed reader: www.rapidsiteplan.au/site-plan/griffith/feed.xml. Every council and state has one, listed on rule changes by council and state.

RapidSiteplan is design software: you confirm details, measure on site and your certifier or council makes the approval decision. The rule above is general information, not building or legal advice. Boundaries shown are indicative, a surveyor is recommended where exact positions matter.