Site plans for Greater Geelong, Victoria: drawn in minutes

Need a site plan for a shed, patio, carport, deck, pool or granny flat in Greater Geelong? Site plans and assessments in minutes, drawn over the real lot.

Towns and suburbs in Greater Geelong include Geelong, Ocean Grove, Lara, Armstrong Creek and Belmont.

Building in Greater Geelong

Greater Geelong runs more local residential settings than most Victorian councils. An incremental change schedule caps height, with a little extra on sloping land. An increased housing diversity schedule caps site coverage, sets the street setback from the neighbouring buildings with more required in a heritage overlay, and trims secluded private open space. The Geelong West schedule and the Ocean Grove hillside and coastal fringe schedule each set height limits, and a Barwon Heads schedule sets a large minimum lot size.

Elsewhere, including Lara, Armstrong Creek and Belmont, several schedules carry character objectives only. Barwon Water decides build-over, and the Greater Geelong planning register shows lodged applications.

What we hold for Greater Geelong

For Greater Geelong we hold the council’s own rules for:

  • sheds, garden sheds, garages and carports
  • patios, pergolas, louvred roofs, decks and shade sails
  • pools, fences and retaining walls
  • granny flats
  • driveways, water tanks and shipping containers

We also hold its current fee schedule.

Build-over of sewer and water assets is decided by Barwon Water.

At each lot we check the state’s mapping for flood, bushfire, landslide, heritage and native vegetation. We also read the council’s application register for past applications on the lot.

Last checked

How approval works in Victoria

In Victoria a building permit comes from a registered building surveyor, either the council's municipal building surveyor or a private one. A small structure can be exempt from a building permit, but it still has to meet the siting rules. Where a structure cannot meet a siting rule, the building surveyor asks the council for its report and consent before issuing the permit. A planning permit from the council is a separate application, needed where the zone or an overlay on the block calls for one. The building surveyor reads the site plan for the structure's distance to each boundary, its height near the boundary and what else stands on the lot. The siting rules decide most small structures, as per the Building Regulations 2018 and, where a planning permit is needed, the single home code.

Drawing the plan

Type the property address, the lot’s real boundaries load from official land records in Victoria, and you place the structure over the aerial view. The plan prints to scale with boundary lengths, setback distances, a north arrow, a legend, a site coverage table and a title block, as the site plan for a building permit or a planning permit.

What a certifier in Greater Geelong will ask you

Is the patio a pergola, a louvred roof or a solid roof?

An open pergola and a roofed patio are treated differently near the boundary, and louvres that shut to shed water count as a roof. Roofed, it also adds to the site cover total on the sheet.

Is the carport open, or closed in?

How open the carport is changes whether it needs a fire rated wall near the boundary, and a roller door or a later enclosure reopens the question. A shed never takes the open carport exemption.

Is the lot in an overlay, and what is the zoning?

A flood, bushfire, heritage or character overlay can bring a planning approval on top of the building approval, and the zone decides which of the council’s rules apply. The mapped overlays are read at the lot as the structure goes on the plan.

Are there easements, sewer mains or other services?

Work near a sewer or water main goes to the asset owner before the certifier can sign it off, on a timeline of its own. Mapped easements and mains show on the lot as it loads.

The figures for your own lot are read in a minute, from its address.

Every question a certifier asks is on the Victoria page.

Changes on the way

Rule changes announced for Greater Geelong, for Victoria and for the whole country, the state and national lines in full on the Victoria page, each with the page that says so and the day we read it.

In the next 90 days

Nothing due in the next 90 days that we know of.

Later

  1. CommencesAustralia-wide

    ABCB Housing Provisions 2025 (with NCC 2025)

    Source abcb.gov.au, read

  2. CommencesAustralia-wide

    AS 1926.1:2024 Swimming pool safety barriers

    Source ncc.abcb.gov.au, read

  3. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 10.8

    Source ncc.abcb.gov.au, read

  4. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 9.2

    Source ncc.abcb.gov.au, read

  5. CommencesAustralia-wide

    NCC 2025 Volume Two Part H6, Specification 42 and Housing Provisions Section 13

    Source ncc.abcb.gov.au, read

  6. CommencesAustralia-wide

    NCC 2025 Volume Two Part H8

    Source ncc.abcb.gov.au, read

  7. AdoptedVictoria

    Planning Amendment (Better Decisions Made Faster) Act 2026

    Source planning.vic.gov.au, read

  8. AnnouncedVictoria

    Building Regulations 2018 (sunset and remake)

    Source vic.gov.au, read

  9. AdoptedAustralia-wide

    National Construction Code, residential pause

    Source treasury.gov.au, read

  10. AnnouncedAustralia-wide

    National Construction Code, next edition

    Source abcb.gov.au, read

  11. No date yet

    AnnouncedAustralia-wide

    AS 3959:2018 Construction of buildings in bushfire prone areas

    Source store.standards.org.au, read

  12. No date yet

    AnnouncedAustralia-wide

    AS 4678-2002 Earth retaining structures

    Source store.standards.org.au, read

Date passed, next step not seen yet

  1. CommencesVictoria

    Building Amendment (Siting and Other Matters) Regulations 2026, S.R. 173/2026, and Building Amendment (Small Second Dwellings) Regulations 2026, S.R. 174/2026

    Source content.legislation.vic.gov.au, read

What we changed for Greater Geelong

The rules we hold for Greater Geelong, each brought up to date from the page it names, newest first. The summary above reads from them.

  1. Council rules

    Read from Greater Geelong TZ Township Zone schedule, none specified

  2. Fees

    Read from Greater Geelong engineering permit fees

Council notices

No story for Greater Geelong yet.

The sources we read for Greater Geelong

16 sources read for Greater Geelong, the newest on , each below with the day it was last read.

Planning schemes and codes

Fees

Follow Greater Geelong in a feed reader: www.rapidsiteplan.au/site-plan/greater-geelong/feed.xml. Every council and state has one, listed on rule changes by council and state.

RapidSiteplan is design software: you confirm details, measure on site and your certifier or council makes the approval decision. The rule above is general information, not building or legal advice. Boundaries shown are indicative, a surveyor is recommended where exact positions matter.

Serving postcodes 3220 and surrounds.

Cookies and local storage

Essential cookies and local storage keep you signed in and hold your plan. Google Analytics and Microsoft Clarity measure how these public pages are used while you are signed out; untick Analytics to switch them off. No advertising, nothing sold.