RapidSiteplan

Site plans for Coolamon, New South Wales: drawn in minutes

Need a site plan for a shed, patio, carport, deck, pool or granny flat in Coolamon? Site plans and assessments in minutes, drawn over the real lot.

Building in Coolamon

Coolamon Shire protects winter sun. A new building must leave a neighbour's north-facing living room windows, and half their private open space, with a good share of sunlight through the middle of a midwinter day, so a tall shed on the northern boundary deserves a careful look.

Village houses sit well back from the front, close to the sides and may be built to the rear, while rural-residential and rural houses keep large setbacks all round. On village blocks under a set size a garage or carport should not sit in front of the house unless it is designed to look like part of it. A home without town water keeps a large tank store, part of it reserved for fire fighting, and on flood-liable land floors are raised above the flood level.

Applications to Coolamon Shire Council are lodged through the NSW Planning Portal.

What we hold for Coolamon

For Coolamon we hold the council’s own rules for:

  • sheds, garden sheds, garages and carports
  • patios, pergolas, louvred roofs, decks and shade sails
  • pools, fences and retaining walls
  • granny flats
  • driveways, water tanks and shipping containers

At each lot we check the state’s mapping for flood, bushfire, landslide, heritage and native vegetation. We also read the council’s application register for past applications on the lot.

Last checked

How approval works in New South Wales

In New South Wales a small structure goes through the planning pathway it fits. Exempt development needs no approval and nothing is lodged, but the structure has to meet every exempt standard and the land must not be excluded from it. Complying development is a fast approval: a complying development certificate from a registered certifier or the council, for work that meets the state's complying standards. Anything else needs a development application to the council, assessed against its local environmental plan and development control plan. The certifier or the council reads the site plan for the structure's size and its distance to each boundary and the house, and for exempt work the plan is the owner's own record. Size, height, distance to each boundary and the land itself decide the pathway, as per the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008.

Drawing the plan

Type the property address, the lot’s real boundaries load from official land records in New South Wales, and you place the structure over the aerial view. The plan prints to scale with boundary lengths, setback distances, a north arrow, a legend, a site coverage table and a title block, as the site plan for a DA or a complying development certificate.

What a certifier in Coolamon will ask you

Is the patio a pergola, a louvred roof or a solid roof?

An open pergola and a roofed patio are treated differently near the boundary, and louvres that shut to shed water count as a roof. Roofed, it also adds to the site cover total on the sheet.

Is the carport open, or closed in?

How open the carport is changes whether it needs a fire rated wall near the boundary, and a roller door or a later enclosure reopens the question. A shed never takes the open carport exemption.

Is the lot in an overlay, and what is the zoning?

A flood, bushfire, heritage or character overlay can bring a planning approval on top of the building approval, and the zone decides which of the council’s rules apply. The mapped overlays are read at the lot as the structure goes on the plan.

How high can a retaining wall and a fence go?

Each takes its own height test, and a retaining wall carrying a fence has its own approval. Both heights go on the sheet for the certifier to read together.

The figures for your own lot are read in a minute, from its address.

Every question a certifier asks is on the New South Wales page.

Changes on the way

Rule changes announced for Coolamon, for New South Wales and for the whole country, the state and national lines in full on the New South Wales page, each with the page that says so and the day we read it.

In the next 90 days

  1. ExhibitedNew South Wales

    Codes SEPP and the complying development variations pathway

    Source planningportal.nsw.gov.au, read

Later

  1. CommencesNew South Wales

    National Construction Code 2025

    Source nsw.gov.au, read

  2. CommencesAustralia-wide

    ABCB Housing Provisions 2025 (with NCC 2025)

    Source abcb.gov.au, read

  3. CommencesAustralia-wide

    AS 1926.1:2024 Swimming pool safety barriers

    Source ncc.abcb.gov.au, read

  4. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 10.8

    Source ncc.abcb.gov.au, read

  5. CommencesAustralia-wide

    NCC 2025 Housing Provisions Part 9.2

    Source ncc.abcb.gov.au, read

  6. CommencesAustralia-wide

    NCC 2025 Volume Two Part H6, Specification 42 and Housing Provisions Section 13

    Source ncc.abcb.gov.au, read

  7. CommencesAustralia-wide

    NCC 2025 Volume Two Part H8

    Source ncc.abcb.gov.au, read

  8. AdoptedAustralia-wide

    National Construction Code, residential pause

    Source treasury.gov.au, read

  9. AnnouncedAustralia-wide

    National Construction Code, next edition

    Source abcb.gov.au, read

  10. No date yet

    AdoptedNew South Wales

    Building (Approvals and Practitioners) Act 2026

    Source nsw.gov.au, read

  11. No date yet

    ExhibitedNew South Wales

    Planning for Bush Fire Protection 2026

    Source rfs.nsw.gov.au, read

  12. No date yet

    ExhibitedNew South Wales

    Standard and model conditions of consent (explanation of intended effect)

    Source planningportal.nsw.gov.au, read

  13. No date yet

    ExhibitedNew South Wales

    Statewide low rise housing code and targeted assessment (discussion paper)

    Source planningportal.nsw.gov.au, read

  14. No date yet

    AnnouncedAustralia-wide

    AS 3959:2018 Construction of buildings in bushfire prone areas

    Source store.standards.org.au, read

  15. No date yet

    AnnouncedAustralia-wide

    AS 4678-2002 Earth retaining structures

    Source store.standards.org.au, read

What we changed for Coolamon

The rules we hold for Coolamon, each brought up to date from the page it names, newest first. The summary above reads from them.

  1. Council rules

    Read from coolamon.nsw.gov.au

Council notices

No story for Coolamon yet.

The sources we read for Coolamon

1 source read for Coolamon, the newest on , each below with the day it was last read.

Planning schemes and codes

Follow Coolamon in a feed reader: www.rapidsiteplan.au/site-plan/coolamon/feed.xml. Every council and state has one, listed on rule changes by council and state.

RapidSiteplan is design software: you confirm details, measure on site and your certifier or council makes the approval decision. The rule above is general information, not building or legal advice. Boundaries shown are indicative, a surveyor is recommended where exact positions matter.

Cookies and local storage

Essential cookies and local storage keep you signed in and hold your plan. Google Analytics and Microsoft Clarity measure how these public pages are used while you are signed out; untick Analytics to switch them off. No advertising, nothing sold.