Site plans for Campaspe, Victoria: drawn in minutes
Need a site plan for a shed, patio, carport, deck, pool or granny flat in Campaspe? Site plans and assessments in minutes, drawn over the real lot.
Building in Campaspe
Front fences in the Echuca West precinct are held lower than the state otherwise allows; that's the one local setting in the precinct schedule, with everything else left to the state. Elsewhere in Campaspe the residential schedules keep the state's setback, site cover, open space, fence and height figures, and the minimum garden area requirement still applies.
Township Zone lots use the state single home standards when a planning permit is needed. Low Density Residential lots have no outbuilding size in the schedule, though an overlay can still bring a shed into a planning permit. The Campaspe planning register search lists current applications, and the state's flood, bushfire and heritage mapping is checked for each lot.
What we hold for Campaspe
For Campaspe we hold the council’s own rules for:
- sheds, garden sheds, garages and carports
- patios, pergolas, louvred roofs, decks and shade sails
- pools, fences and retaining walls
- granny flats
- driveways, water tanks and shipping containers
At each lot we check the state’s mapping for flood, bushfire, landslide, heritage and native vegetation. We also read the council’s application register for past applications on the lot.
Last checked
How approval works in Victoria
In Victoria a building permit comes from a registered building surveyor, either the council's municipal building surveyor or a private one. A small structure can be exempt from a building permit, but it still has to meet the siting rules. Where a structure cannot meet a siting rule, the building surveyor asks the council for its report and consent before issuing the permit. A planning permit from the council is a separate application, needed where the zone or an overlay on the block calls for one. The building surveyor reads the site plan for the structure's distance to each boundary, its height near the boundary and what else stands on the lot. The siting rules decide most small structures, as per the Building Regulations 2018 and, where a planning permit is needed, the single home code.
Drawing the plan
Type the property address, the lot’s real boundaries load from official land records in Victoria, and you place the structure over the aerial view. The plan prints to scale with boundary lengths, setback distances, a north arrow, a legend, a site coverage table and a title block, as the site plan for a building permit or a planning permit.
What a certifier in Campaspe will ask you
Is the patio a pergola, a louvred roof or a solid roof?
An open pergola and a roofed patio are treated differently near the boundary, and louvres that shut to shed water count as a roof. Roofed, it also adds to the site cover total on the sheet.
Is the carport open, or closed in?
How open the carport is changes whether it needs a fire rated wall near the boundary, and a roller door or a later enclosure reopens the question. A shed never takes the open carport exemption.
Is the lot in an overlay, and what is the zoning?
A flood, bushfire, heritage or character overlay can bring a planning approval on top of the building approval, and the zone decides which of the council’s rules apply. The mapped overlays are read at the lot as the structure goes on the plan.
How high can a retaining wall and a fence go?
Each takes its own height test, and a retaining wall carrying a fence has its own approval. Both heights go on the sheet for the certifier to read together.
The figures for your own lot are read in a minute, from its address.
Every question a certifier asks is on the Victoria page.
Changes on the way
Rule changes announced for Campaspe, for Victoria and for the whole country, the state and national lines in full on the Victoria page, each with the page that says so and the day we read it.
In the next 90 days
Nothing due in the next 90 days that we know of.
Later
-
ABCB Housing Provisions 2025 (with NCC 2025)
Source abcb.gov.au, read
-
AS 1926.1:2024 Swimming pool safety barriers
Source ncc.abcb.gov.au, read
-
NCC 2025 Housing Provisions Part 10.8
Source ncc.abcb.gov.au, read
-
NCC 2025 Housing Provisions Part 9.2
Source ncc.abcb.gov.au, read
-
NCC 2025 Volume Two Part H6, Specification 42 and Housing Provisions Section 13
Source ncc.abcb.gov.au, read
-
NCC 2025 Volume Two Part H8
Source ncc.abcb.gov.au, read
-
Planning Amendment (Better Decisions Made Faster) Act 2026
Source planning.vic.gov.au, read
-
Building Regulations 2018 (sunset and remake)
Source vic.gov.au, read
-
National Construction Code, residential pause
Source treasury.gov.au, read
-
National Construction Code, next edition
Source abcb.gov.au, read
-
No date yet
AS 3959:2018 Construction of buildings in bushfire prone areas
Source store.standards.org.au, read
-
No date yet
AS 4678-2002 Earth retaining structures
Source store.standards.org.au, read
Date passed, next step not seen yet
-
Building Amendment (Siting and Other Matters) Regulations 2026, S.R. 173/2026, and Building Amendment (Small Second Dwellings) Regulations 2026, S.R. 174/2026
Source content.legislation.vic.gov.au, read
What we changed for Campaspe
The rules we hold for Campaspe, each brought up to date from the page it names, newest first. The summary above reads from them.
-
Council rules
Read from Campaspe LDRZ Low Density Residential Zone schedule, no outbuilding dimensions
-
Council rules
Read from Campaspe TZ Township Zone schedule, none specified
-
Council rules
Read from Campaspe Planning Scheme GRZ schedule
Council notices
No story for Campaspe yet.
The sources we read for Campaspe
4 sources read for Campaspe, the newest on , each below with the day it was last read.
Planning schemes and codes
-
Campaspe Planning Scheme GRZ schedule
Changed since the read before
-
Campaspe Planning Scheme NRZ1 schedule
Changed since the read before
Follow Campaspe in a feed reader: www.rapidsiteplan.au/site-plan/campaspe/feed.xml. Every council and state has one, listed on rule changes by council and state.
RapidSiteplan is design software: you confirm details, measure on site and your certifier or council makes the approval decision. The rule above is general information, not building or legal advice. Boundaries shown are indicative, a surveyor is recommended where exact positions matter.
Plans for the job
Questions people ask
More councils in Victoria