Site plans for Burwood, New South Wales: drawn in minutes
Need a site plan for a shed, patio, carport, deck, pool or granny flat in Burwood? Site plans and assessments in minutes, drawn over the real lot.
Building in Burwood
Second storeys are where Burwood's rules bite. A single-storey front follows the local building line, but any upper floor must step a long way back from the street, and second-storey walls keep a wider side gap than the ground floor. Rear setbacks also deepen for upper levels.
Built area counts every floor plus garages, carports and outbuildings, and the council caps that total, while a share of both the front and rear yards must stay soft landscaping. Garages stay out of the dwelling setbacks with limits on wall and door height and roof pitch, and garage openings take only part of the house front. A carport is preferred in the rear yard, with a size cap and a gap to the side boundary when beside the house.
Pools stay out of the front yard. Burwood Council takes development applications through the NSW Planning Portal.
What we hold for Burwood
For Burwood we hold the council’s own rules for:
- sheds, garden sheds, garages and carports
- patios, pergolas, louvred roofs, decks and shade sails
- pools, fences and retaining walls
- granny flats
- driveways, water tanks and shipping containers
At each lot we check the state’s mapping for flood, bushfire, landslide, heritage and native vegetation. We also read the council’s application register for past applications on the lot.
Last checked
How approval works in New South Wales
In New South Wales a small structure goes through the planning pathway it fits. Exempt development needs no approval and nothing is lodged, but the structure has to meet every exempt standard and the land must not be excluded from it. Complying development is a fast approval: a complying development certificate from a registered certifier or the council, for work that meets the state's complying standards. Anything else needs a development application to the council, assessed against its local environmental plan and development control plan. The certifier or the council reads the site plan for the structure's size and its distance to each boundary and the house, and for exempt work the plan is the owner's own record. Size, height, distance to each boundary and the land itself decide the pathway, as per the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008.
Drawing the plan
Type the property address, the lot’s real boundaries load from official land records in New South Wales, and you place the structure over the aerial view. The plan prints to scale with boundary lengths, setback distances, a north arrow, a legend, a site coverage table and a title block, as the site plan for a DA or a complying development certificate.
What a certifier in Burwood will ask you
How high can a retaining wall and a fence go?
Each takes its own height test, and a retaining wall carrying a fence has its own approval. Both heights go on the sheet for the certifier to read together.
How big can a granny flat be, and how far from the house?
The council caps a granny flat’s floor area, and some councils also limit how far from the house it may stand. The sheet prints the floor area and dimensions the distance to the house.
Is the lot in an overlay, and what is the zoning?
A flood, bushfire, heritage or character overlay can bring a planning approval on top of the building approval, and the zone decides which of the council’s rules apply. The mapped overlays are read at the lot as the structure goes on the plan.
How deep is the pool?
The depth decides whether the water needs a barrier, and the barrier has to be in place before the pool is filled. The barrier is what gets inspected, so the sheet shows where it runs and every gate with its swing.
The figures for your own lot are read in a minute, from its address.
Every question a certifier asks is on the New South Wales page.
Changes on the way
Rule changes announced for Burwood, for New South Wales and for the whole country, the state and national lines in full on the New South Wales page, each with the page that says so and the day we read it.
In the next 90 days
-
Codes SEPP and the complying development variations pathway
Source planningportal.nsw.gov.au, read
Later
-
National Construction Code 2025
Source nsw.gov.au, read
-
ABCB Housing Provisions 2025 (with NCC 2025)
Source abcb.gov.au, read
-
AS 1926.1:2024 Swimming pool safety barriers
Source ncc.abcb.gov.au, read
-
NCC 2025 Housing Provisions Part 10.8
Source ncc.abcb.gov.au, read
-
NCC 2025 Housing Provisions Part 9.2
Source ncc.abcb.gov.au, read
-
NCC 2025 Volume Two Part H6, Specification 42 and Housing Provisions Section 13
Source ncc.abcb.gov.au, read
-
NCC 2025 Volume Two Part H8
Source ncc.abcb.gov.au, read
-
National Construction Code, residential pause
Source treasury.gov.au, read
-
National Construction Code, next edition
Source abcb.gov.au, read
-
No date yet
Building (Approvals and Practitioners) Act 2026
Source nsw.gov.au, read
-
No date yet
Planning for Bush Fire Protection 2026
Source rfs.nsw.gov.au, read
-
No date yet
Standard and model conditions of consent (explanation of intended effect)
Source planningportal.nsw.gov.au, read
-
No date yet
Statewide low rise housing code and targeted assessment (discussion paper)
Source planningportal.nsw.gov.au, read
-
No date yet
AS 3959:2018 Construction of buildings in bushfire prone areas
Source store.standards.org.au, read
-
No date yet
AS 4678-2002 Earth retaining structures
Source store.standards.org.au, read
What we changed for Burwood
The rules we hold for Burwood, each brought up to date from the page it names, newest first. The summary above reads from them.
-
Council rules
Read from burwood.nsw.gov.au
Council notices
No story for Burwood yet.
The sources we read for Burwood
No page of Burwood’s own is on our watch yet.
Follow Burwood in a feed reader: www.rapidsiteplan.au/site-plan/burwood/feed.xml. Every council and state has one, listed on rule changes by council and state.
RapidSiteplan is design software: you confirm details, measure on site and your certifier or council makes the approval decision. The rule above is general information, not building or legal advice. Boundaries shown are indicative, a surveyor is recommended where exact positions matter.
Plans for the job
Questions people ask
More councils in New South Wales