Site plans for Bass Coast, Victoria: drawn in minutes
Need a site plan for a shed, patio, carport, deck, pool or granny flat in Bass Coast? Site plans and assessments in minutes, drawn over the real lot.
Towns and suburbs in Bass Coast include Wonthaggi, Inverloch, Cowes, San Remo and Grantville.
Building in Bass Coast
Build-over in Bass Coast is split between two water authorities: Westernport Water covers most of the shire, including Cowes, while South Gippsland Water looks after Wonthaggi and Inverloch. Whichever one owns the main beside your slab decides whether you can build near it.
Bass Coast applies no schedule to the Neighbourhood Residential Zone, and its General Residential schedule sets no local figures, so state settings govern setbacks, site cover, open space, front fences and height, with the minimum garden area requirement still in force. Township Zone lots in places like San Remo or Grantville take the state single home standards when a planning permit is needed. The council keeps a planning permit register for lodged applications.
What we hold for Bass Coast
For Bass Coast we hold the council’s own rules for:
- sheds, garden sheds, garages and carports
- patios, pergolas, louvred roofs, decks and shade sails
- pools, fences and retaining walls
- granny flats
- driveways, water tanks and shipping containers
We also hold its current fee schedule.
Build-over of sewer and water assets is decided by Westernport Water.
At each lot we check the state’s mapping for flood, bushfire, landslide, heritage and native vegetation. We also read the council’s application register for past applications on the lot.
Last checked
How approval works in Victoria
In Victoria a building permit comes from a registered building surveyor, either the council's municipal building surveyor or a private one. A small structure can be exempt from a building permit, but it still has to meet the siting rules. Where a structure cannot meet a siting rule, the building surveyor asks the council for its report and consent before issuing the permit. A planning permit from the council is a separate application, needed where the zone or an overlay on the block calls for one. The building surveyor reads the site plan for the structure's distance to each boundary, its height near the boundary and what else stands on the lot. The siting rules decide most small structures, as per the Building Regulations 2018 and, where a planning permit is needed, the single home code.
Drawing the plan
Type the property address, the lot’s real boundaries load from official land records in Victoria, and you place the structure over the aerial view. The plan prints to scale with boundary lengths, setback distances, a north arrow, a legend, a site coverage table and a title block, as the site plan for a building permit or a planning permit.
What a certifier in Bass Coast will ask you
Is the patio a pergola, a louvred roof or a solid roof?
An open pergola and a roofed patio are treated differently near the boundary, and louvres that shut to shed water count as a roof. Roofed, it also adds to the site cover total on the sheet.
Is the carport open, or closed in?
How open the carport is changes whether it needs a fire rated wall near the boundary, and a roller door or a later enclosure reopens the question. A shed never takes the open carport exemption.
Is the lot in an overlay, and what is the zoning?
A flood, bushfire, heritage or character overlay can bring a planning approval on top of the building approval, and the zone decides which of the council’s rules apply. The mapped overlays are read at the lot as the structure goes on the plan.
Are there easements, sewer mains or other services?
Work near a sewer or water main goes to the asset owner before the certifier can sign it off, on a timeline of its own. Mapped easements and mains show on the lot as it loads.
The figures for your own lot are read in a minute, from its address.
Every question a certifier asks is on the Victoria page.
Changes on the way
Rule changes announced for Bass Coast, for Victoria and for the whole country, the state and national lines in full on the Victoria page, each with the page that says so and the day we read it.
In the next 90 days
Nothing due in the next 90 days that we know of.
Later
-
ABCB Housing Provisions 2025 (with NCC 2025)
Source abcb.gov.au, read
-
AS 1926.1:2024 Swimming pool safety barriers
Source ncc.abcb.gov.au, read
-
NCC 2025 Housing Provisions Part 10.8
Source ncc.abcb.gov.au, read
-
NCC 2025 Housing Provisions Part 9.2
Source ncc.abcb.gov.au, read
-
NCC 2025 Volume Two Part H6, Specification 42 and Housing Provisions Section 13
Source ncc.abcb.gov.au, read
-
NCC 2025 Volume Two Part H8
Source ncc.abcb.gov.au, read
-
Planning Amendment (Better Decisions Made Faster) Act 2026
Source planning.vic.gov.au, read
-
Building Regulations 2018 (sunset and remake)
Source vic.gov.au, read
-
National Construction Code, residential pause
Source treasury.gov.au, read
-
National Construction Code, next edition
Source abcb.gov.au, read
-
No date yet
AS 3959:2018 Construction of buildings in bushfire prone areas
Source store.standards.org.au, read
-
No date yet
AS 4678-2002 Earth retaining structures
Source store.standards.org.au, read
Date passed, next step not seen yet
-
Building Amendment (Siting and Other Matters) Regulations 2026, S.R. 173/2026, and Building Amendment (Small Second Dwellings) Regulations 2026, S.R. 174/2026
Source content.legislation.vic.gov.au, read
What we changed for Bass Coast
The rules we hold for Bass Coast, each brought up to date from the page it names, newest first. The summary above reads from them.
-
Council rules
Read from Bass Coast LDRZ Low Density Residential Zone schedule, no outbuilding dimensions
-
Council rules
Read from Bass Coast TZ Township Zone schedule, none specified
Council notices
No story for Bass Coast yet.
The sources we read for Bass Coast
6 sources read for Bass Coast, the newest on , each below with the day it was last read.
Planning schemes and codes
-
Bass Coast Planning Scheme GRZ schedule
Changed since the read before
Fees
-
No change
Follow Bass Coast in a feed reader: www.rapidsiteplan.au/site-plan/bass-coast/feed.xml. Every council and state has one, listed on rule changes by council and state.
RapidSiteplan is design software: you confirm details, measure on site and your certifier or council makes the approval decision. The rule above is general information, not building or legal advice. Boundaries shown are indicative, a surveyor is recommended where exact positions matter.
Plans for the job
Questions people ask
More councils in Victoria