Usually, once it stays. A container parked on a building site while the house goes up is one thing. The same container left in the backyard as a store becomes a building, and it is read much like a shed. That brings the shed questions: its size and height, where it sits against the boundaries and the house, what it stands on and how it is held down against the wind. Many councils add questions of their own about containers, because of how they look from the street.
What decides it?
Use is the first question, and storage is the simple case. A container fitted out as a room, a studio or a place to sleep becomes a different kind of building, with the rules for rooms people use, and one used for a business brings the zone into it. How long it stays matters to the council too, since a container on a building site for the length of the job is often allowed where a permanent one is not.
Placement is read as it is for a shed, and often more strictly, because containers are tall and plain and the street sees them. Stacking them raises the height question straight away. In a rural zone a container on a large lot meets fewer of these questions than one on a suburban block, and a heritage, character or bushfire overlay can bring its own. The post on sheds and planning explains how the zone and the overlays work.
Does it need to be tied down?
Often. A container is light for its size, and in a windy area the certifier will want to see what it stands on and how it is fixed to it, with the wind rating of the site setting how strong the fixing has to be. The post on wind classes explains how that rating is read.
Who decides?
The council decides the planning side: whether the zone allows it, whether it can sit where you want it, and any overlay. The certifier, or the council where it assesses building work, decides the building approval. A container someone will live in needs both, on the terms for a dwelling rather than a shed.
What goes on the site plan?
- the container at its real size, with its height and any stacking
- its distance to each boundary and to the house
- what it stands on, and how it is tied down
- the way in, and any easement or main nearby
- a north point and a scale
Reading it for your own lot
RapidSiteplan reads the lot from its address in a minute: the boundaries, the buildings already there, the zone where it is mapped, the overlays over the block and the wind rating for the site. Place the container as a shed at its size and the sheet dimensions its distance to every boundary and to the house. The page for sheds and outbuildings shows the sheet, the post on council approval for a shed covers the size question, and the council pages for every state show what each council maps. Start with the address.
Common questions
Do I need council approval for a shipping container? Usually, once it stays. A container left on a lot is read much like a shed, so its size, where it sits, how it is held down and what it is used for decide whether it needs building approval, and the zone and the overlays decide whether the council has a planning question as well.
Read next
Can I apply for council approval myself?Who you lodge with, and who draws the plans Do I need council approval for a garage?A garage big enough for a car usually needs building approval Do I need council approval to concrete my backyard?Concreting a yard turns on where the water goes, how much garden is left, the manholes and the levelsGeneral information only, not building or legal advice, requirements vary by council and change over time; always confirm with your council or certifier.